Buyer's brief
What this guide helps you decide
- MOQ is counted per colour and per design, not for the whole order.
- Thirty pieces can change colour, trim and decoration. It cannot pay for a new pattern block or a new fabric.
- Higher unit cost on a small run comes from fixed setup work, not from a penalty.
- The reorder is where you make money. Check the dye lot and reorder MOQ before you place the first order.
01 — The rule
What MOQ actually counts
MOQ is not one number for the whole order. It is counted per colour and per design. Thirty pieces in one colour is a valid run. Ten pieces in three colours is not, because the factory sets up three times.
This is the first thing to fix in your plan. Most new brands pick five colours, then learn the rule after the quote.
Our minimum run is 30 pieces per colour and design. An owner-and-pet pair counts as one design, not two.
02 — The tiers
The three tiers and what changes in each
Each tier buys you more freedom. The jump is not about price. It is about what the factory can change without new setup.
| Tier | What it is for | What you can change |
|---|---|---|
| 30–100 pcs | First run and market test | Colour, trims, decoration and label. Not a new pattern block. |
| 100–499 pcs | Standard production | Fabric weight inside the approved family, new size steps, printed packaging. |
| 500+ pcs | Volume programme | New fabric development, custom trims, tiered pricing. |
03 — Cost logic
Why thirty pieces cost more per unit
A small order carries the same setup work as a large one. You pay for that setup across fewer pieces, so each piece costs more.
- →Pattern and grading: a one-time job, spread over 30 pieces instead of 3,000.
- →Cutting: a short lay wastes more fabric at the ends of the table.
- →Dyeing: the dye house sets a minimum per colour that is often far above 30 pieces.
- →Trims: zips, webbing, labels and thread each have their own minimum.
- →Packaging: printed bags and boxes have a print minimum of their own.
04 — Limits
What you can and cannot change on a 30 piece run
Think of the first run as a colour and trim exercise on a shape that already exists.
- →Yes: fabric colour from the current card, decoration placement, label and hang tag, rib colour, pouch weight tier on the carrier hoodie.
- →No: a new pattern block, a new fabric development, a custom moulded zip pull, a new tooling part.
- →Ask anyway: sometimes an existing block is close enough, and a small change is possible at 100 pieces.
05 — Size plan
How to split thirty pieces across sizes
Sizes do not sell evenly. A flat split across four sizes is easy to plan and often wrong in the market.
Ask for the size curve sheet before you pay. It shows what you ordered in each size, so the reorder can follow the real sell-through instead of the first guess.
For dog apparel, keep the range tight at first. XS to L covers most small and medium breeds. Add XL and 3XL after you see which buyers come back.
06 — Risk
Three things that break a first order
Most first orders fail on small details, not on the big idea.
- →Colour approved on a screen. A lab dip is a small piece of real dyed fabric. Approve that, not a photo.
- →A trim minimum missed. The zip you chose needs 500 pieces. You find out in week three and take a substitute.
- →Packaging print minimum missed. The retail look you planned is not possible at 30 pieces, so the product arrives in a plain bag.
07 — The real money
Plan the reorder before the first order
The first run tests the market. The second run is where a brand starts to earn. So ask three questions at quote stage.
- →How long is the dye lot held, and can I repeat this exact shade in three months?
- →What is the reorder minimum for the same design and colour?
- →How many days from reorder to ship, and does that change in a peak season?
08 — Retail finish
How to make thirty pieces look like a real brand
A small run can still look like a brand. The finishing work costs very little, and it changes how the product reads in a photo and on a shelf.
Ask for these items in the first quote, not after the goods are packed. A label that arrives late cannot be sewn in.
Keep a small stock of spare labels, hang tags and bags. A reorder ships faster when the trims are already in house.
- →A woven label, not a printed one, if the brand is sold at a higher price point.
- →A hang tag with the size, the fibre content and the care line.
- →A polybag with a barcode sticker if you sell on a marketplace.
- →A size sticker on the outside of the bag, so warehouse staff do not open it to check.
- →One photo set on a plain background, shot before the goods ship.
09 — Brief
What to send for a quote
A clear brief gets a clear price. Send these eight items in one message and most questions answer themselves.
- →Product type and reference photos.
- →Size range and the split you want in each size.
- →Colours, with a Pantone reference if you have one.
- →Fabric direction, or ask for the closest build we run.
- →Decoration method and placement.
- →Labels, hang tags and packaging needs.
- →Target ship date and destination country.
- →Order quantity now, and the volume you expect in twelve months.
{t.continueSourcing}
{t.related}
{t.faqEyebrow}
{t.faqTitle}
Can I mix sizes inside a 30 piece order?
Yes. Thirty pieces is the minimum per colour and design, and you can split those thirty across sizes in any way you need.
Can I get five colours in a 30 piece order?
Not as one run. The minimum applies per colour, so five colours means five setup runs. Most first orders start with one or two colours and add more after the market test.
How long does a small order take?
Pre-production samples take 3 to 5 business days. After you approve the sample and the specification, bulk production is typically 20 days.
